ppr pipe installation method and precautions
Release time:
2021-09-15
The most common problem with PPR water pipes is leaks. Be standardized when installing. 1. When using PPR fittings with metal threads, a foot seal must be used to avoid water leakage at the threads. 2. Do not overtighten the fittings to avoid cracks and leaks. 3. It is best to cut off 4-5cm at both ends of the pipe. 4. During construction in winter, the pipeline should avoid stepping on, knocking, colliding and throwing. 5. A boost test must be performed after installation. The pressure test time is 30 minutes, and the pressure is 8-10 kg, without leakage or leakage. 6. It is best to go to the top of the water pipe for easy maintenance. If it goes underground, it is difficult to find water leakage. 7. If it is found that the wall paint is moldy and blistered, the skirting or wooden floor is black and has fine bubbles, the ceiling and the wall tiles are damp and water seepage, etc., you should check the pipeline as soon as possible.
The most common problem with PPR water pipes is leaks. Be standardized when installing.
1.
When using PPR fittings with metal threads, a foot seal must be used to avoid water leakage at the threads.
2.
Do not overtighten the fittings to avoid cracks and leaks.
3.
It is best to cut off 4-5cm at both ends of the pipe.
4.
During construction in winter, the pipeline should avoid stepping on, knocking, colliding and throwing.
5.
A boost test must be performed after installation. The pressure test time is 30 minutes, and the pressure is 8-10 kg, without leakage or leakage.
6.
It is best to go to the top of the water pipe for easy maintenance. If it goes underground, it is difficult to find water leakage.
7.
If it is found that the wall paint is moldy and blistered, the skirting or wooden floor is black and has fine bubbles, the ceiling and the wall tiles are damp and water seepage, etc., you should check the pipeline as soon as possible.
Related news
Guangdong Shengda Plastic Technology Co., Ltd.
(Overseas Chinese board code:280329)
Tel:400-838-1218
Head Office: Room 301, Ultrasonic Technology Building, No. 9 Keji East Road, High-tech Zone, Shantou City, Guangdong Province
Production base: Guangdong Niutianyang Industrial Zone
Fujian Xinshengda New Material Technology Co., Ltd.
Production base: No. 666, Ludi Industrial Park, Zhao'an Industrial Park, Zhao'an County, Zhangzhou City, Fujian Province
Public
Website
copyright © 2022 Shengda Pipe Industry
Power by:www.300.cn